Skip to content
Notis

Keep business risks visible and actionable

Capture a concern when it appears, then review it alongside its owner and possible response.

Trigger

New Message Received

Triggered when your bot receives a new message in a private chat, group, or supergroup. To receive every message in a group, Privacy Mode must be disabled for the bot in BotFather.

Action

Update Presentation (Batch/Markdown)

Tool to update existing google slides presentations with either raw api requests or markdown content. **two operation modes:** 1. **raw api mode**: provide direct slides api requests for precise control 2. **markdown mode**: provide markdown text to automatically add professional slides **markdown features:** - professional themes with coordinated colors and backgrounds - dynamic font sizing that prevents overflow (notion-like hierarchy) - smart table auto-sizing with column width optimization - auto-centering and professional positioning - bold formatting, emojis, and multi-line content support - multiple slide types: title, bullet, table, quote, image, two-column **use cases:** - add new slides to existing presentations - update presentation content with markdown - apply professional themes and styling - bulk slide creation with consistent formatting

Why this helps

Early warnings get lost when a founder has to hold them in mind until the next planning review.

  • Record concerns at the point they arise.
  • Make risks easier to discuss in a regular review.
  • Keep mitigations tied to the concern they address.

Setup

Build it in a few focused steps.

  • 1Connect Telegram and Google Slides to Notis once in the portal.
  • 2Create an automation in the portal, or ask Notis for one in plain language.
  • 3In one instruction, ask Notis to add messages labeled as risks to the existing review deck, preserving stated likelihood, impact, owner, and mitigation while marking missing details for review.
  • 4Choose the Telegram New Message Received trigger and a channel for run reports.
  • 5Test with a real risk note and check that unknown details are not guessed.

Questions about this workflow

Can it distinguish a risk from a general concern?

Choose a consistent label or phrase in Telegram and include it in the automation instruction.

Does it score risks?

Ask it to preserve any score you provide; otherwise have it mark scoring details as needing review.

When this happens · Trigger

Do this · Action

Supported Triggers and Actions

Notis builds workflows that link Telegram to Google Slides. A trigger fires from one place; an action lands in another.

Telegram triggers

Google Slides actions

Recurring trigger

Notis starts this workflow on a schedule, such as daily, weekly, or during business hours.

TriggerScheduled

Create Slides from Markdown

Creates a new google slides presentation from markdown text. automatically splits content into slides using '---' separators and applies appropriate templates based on content structure.

ActionInstant

Webhook trigger

Notis starts this workflow when an external tool or custom backend sends an HTTP request.

TriggerInstant

Update Presentation (Batch/Markdown)

Tool to update existing google slides presentations with either raw api requests or markdown content. **two operation modes:** 1. **raw api mode**: provide direct slides api requests for precise control 2. **markdown mode**: provide markdown text to automatically add professional slides **markdown features:** - professional themes with coordinated colors and backgrounds - dynamic font sizing that prevents overflow (notion-like hierarchy) - smart table auto-sizing with column width optimization - auto-centering and professional positioning - bold formatting, emojis, and multi-line content support - multiple slide types: title, bullet, table, quote, image, two-column **use cases:** - add new slides to existing presentations - update presentation content with markdown - apply professional themes and styling - bulk slide creation with consistent formatting

ActionInstant

New Message Received

Triggered when your bot receives a new message in a private chat, group, or supergroup. To receive every message in a group, Privacy Mode must be disabled for the bot in BotFather.

TriggerInstant

Create Google Slides Presentation

Tool to create a blank or duplicate presentation. use when you need to initialize a presentation with a specific title or duplicate an existing one.

ActionInstant

New Channel Post

Triggered when a new post is published to a channel where your bot is an administrator.

TriggerInstant

Get Presentation

Tool to retrieve the latest version of a presentation. use after obtaining the presentation id.

ActionInstant

Callback Query Received

Triggered when a user taps an inline keyboard button attached to one of your bot's messages.

TriggerInstant

Get Presentation Page

Tool to get the latest version of a specific page in a presentation. use when you need to inspect slide, layout, master, or notes page details.

ActionInstant

Message Edited

Triggered when a message in a chat your bot can see is edited by its sender.

TriggerInstant

Get Page Thumbnail

Tool to generate and return a thumbnail image url for a specific page. use when you need a quick preview of a slide page after loading it.

ActionInstant

New Chat Member

Triggered when a new member joins a group or supergroup the bot belongs to, including when the bot itself is added.

TriggerInstant

Connect any two apps with Notis in the middle.

Telegram and Google Slides, or any other combination from 1,000+ integrations.

When this happens · Trigger

Do this · Action

Save your first hour today.

7-day trial of any paid plan, with 20$ of usage included.
No card. Works with personal or business Google Slides.