Skip to content
Notis

Keep important risks visible as they change

When a risk entry changes in Notion, Gamma can produce a review that brings its impact, mitigation, and next decision into one view.

Trigger

Page Properties Updated

Triggers when properties of a Notion page are updated. Customer optionally scopes with at most one of: - data_source_id: any row in this data source - page_id: this specific page - parent_page_id: any page whose immediate parent is this page With none set, fires for any property change in the workspace the integration has access to. Adding a column to a data source fires this trigger once per existing row. Customers can branch on `data.updated_properties` (array of property IDs) to filter downstream.

Action

Generate a Gamma

Create a new gamma generation. use to produce an ai-generated presentation/content. docs: https://developers.gamma.app/reference/generate-a-gamma

Why this helps

Risks can change quietly inside a tracker until their consequences become urgent.

  • Make changes in risk and mitigation easier to notice.
  • Bring owners and next decisions into a shared review.
  • Support a calmer review before a risk becomes an emergency.

Setup

Build it in a few focused steps.

  • 1Connect Notion and Gamma to Notis once through the portal.
  • 2Ask Notis to generate a Gamma risk review when meaningful properties change in the risk register.
  • 3Select Page Properties Updated and scope it to the risk data source.
  • 4Choose a run-report channel and test by updating one real risk entry.

Questions about this workflow

Can it focus on high-priority risks?

Describe which priority or status changes merit a review in the plain-language instruction.

Does it assess the risk for me?

Ask Gamma to summarize the recorded assessment and surface missing information, while leaving judgment to the team.

When this happens · Trigger

Do this · Action

Supported Triggers and Actions

Notis builds workflows that link Notion to Gamma. A trigger fires from one place; an action lands in another.

Notion triggers

Gamma actions

Recurring trigger

Notis starts this workflow on a schedule, such as daily, weekly, or during business hours.

TriggerScheduled

Generate a Gamma

Create a new gamma generation. use to produce an ai-generated presentation/content. docs: https://developers.gamma.app/reference/generate-a-gamma

ActionInstant

Webhook trigger

Notis starts this workflow when an external tool or custom backend sends an HTTP request.

TriggerInstant

Get Gamma File URLs

Retrieve generation status and file urls. poll this endpoint every ~5 seconds until status is 'completed'. docs: https://developers.gamma.app/reference/get-gamma-file-urls

ActionInstant

All Page Events

Triggers when any Notion page is created or updated across the workspace.

TriggerPolling

Comment Created

Triggers when a new comment is created in Notion. Optional `page_id` filter scopes to comments on a specific page. When omitted, fires for any new comment in the workspace the integration has access to. Requires the 'Read comments' capability on the Notion integration. If a connection was authorized before that capability was enabled, the user must re-authorize the connection for comment events to flow.

TriggerInstant

New Comment

Triggers when a new comment is added to a specified Notion block or page.

TriggerPolling

Database Created

Triggers when a new Notion database (the container) is created. A database is the post-2025-09-03 container that holds one or more data sources. This trigger fires for the container's creation event (`database.created`), distinct from `NOTION_DATASOURCE_CREATED` which fires when a new data source is added to an existing database. Most customers calling Notion's `POST /v1/databases` (the legacy API) or creating a database via the Notion UI will see this event. Adding a new data source to an existing database fires `data_source.created` instead — use `NOTION_DATASOURCE_CREATED` for that. Notion's payload puts `entity.type: "block"` (the container is a `child_database` block in the content tree) and `entity.id` is the database id.

TriggerInstant

Data Source Created

Triggers when a new Notion data source is created. Fires workspace-wide. The payload's `data.parent` carries the data source's tree parent (typically the teamspace) for downstream filtering. A single template-based database creation can fire multiple `data_source.created` events at once — one per data source the template instantiates.

TriggerInstant

Data Source Schema Updated

Triggers when a Notion data source's schema is updated. Fires on column add / remove / rename. Payload includes `data.updated_properties: [{id, name, action}]` so consumers can discriminate the kind of change downstream. Optional `data_source_id` filter scopes to schema changes on a single data source. When omitted, fires for any schema change in the workspace the integration has access to. Note: adding a column also fires `page.properties_updated` once per existing row in the data source. Customers wanting a single structural-change signal should use this trigger.

TriggerInstant

Connect any two apps with Notis in the middle.

Notion and Gamma, or any other combination from 1,000+ integrations.

When this happens · Trigger

Do this · Action

Save your first hour today.

7-day trial of any paid plan, with 20$ of usage included.
No card. Works with personal or business Gamma.