Turn Drive comments into change order drafts
Capture requested project changes where they are discussed, then generate a structured change order draft for review.
Trigger
Comment Added (Docs/Sheets/Slides)
Triggers when a new comment is added to Google Docs, Sheets, or Slides.
Action
Generate documents from template
Tool to generate document(s) from a template by merging JSON data or uploading a data file. Use when you need to programmatically produce one or more documents and receive metadata including a download URL.
Why this helps
A change request in a document comment can be easy to overlook or leave disconnected from the formal paperwork.
- Bring the new comment and its document context into a draft.
- Create a consistent change order for review.
- Keep a generated output link with the run report.
Setup
Build it in a few focused steps.
- 1Connect Google Drive and Docugenerate once in the Notis portal.
- 2Create an automation and name it for change order drafting.
- 3Tell Notis to use the new comment and available document context to populate your Docugenerate change order template.
- 4Choose the Comment Added trigger and select where run reports should go.
- 5Test with one real comment that describes a change.
Questions about this workflow
Can the workflow decide the price or schedule impact?
Only if that information is available in the comment or document, or you provide rules in your instruction. Otherwise, the generated draft should leave those details for review.
Which documents can trigger it?
The listed trigger covers new comments on Google Docs, Sheets, and Slides.
When this happens · Trigger
Do this · Action
Supported Triggers and Actions
Notis builds workflows that link Google Drive to Docugenerate. A trigger fires from one place; an action lands in another.
Google Drive triggers
Docugenerate actions
Recurring trigger
Notis starts this workflow on a schedule, such as daily, weekly, or during business hours.
Generate documents from template
Tool to generate document(s) from a template by merging JSON data or uploading a data file. Use when you need to programmatically produce one or more documents and receive metadata including a download URL.
Webhook trigger
Notis starts this workflow when an external tool or custom backend sends an HTTP request.
Generate documents as ZIP
Tool to bulk generate multiple documents into a ZIP archive. Use when you need a batch of docs packaged as ZIP.
Comment Added (Docs/Sheets/Slides)
Triggers when a new comment is added to Google Docs, Sheets, or Slides.
Generate document with attachments
Tool to generate a PDF with embedded attachments. Use when you need to bundle extra files into the PDF output.
File Created
Triggers when a new file is created in Google Drive.
Generate document with merge
Tool to generate a PDF and append additional PDF files. Use when you need to merge extra pages into a generated document.
File Deleted or Trashed
Triggers when a file is moved to trash or permanently deleted in Drive.
Update Document
Tool to update a document's metadata. Use when renaming an existing document after confirming the document ID.
File Shared (Permissions Added)
Triggers when new sharing permissions are granted to a file or folder. Uses Drive's `changes.list` endpoint with inline `permissions` in the `fields` mask so each change carries the file's current permission set provider-atomically. We diff that against `seen_permission_keys` to identify newly added grants. Drive page tokens are the primary cursor; if Drive rejects a stored token, the trigger raises `PollingTriggerError` without clearing state rather than silently re-baselining and dropping events. Limitation: truly ephemeral permissions (added and revoked between two polls without any other file modification in between) are not detected. Drive Activity API would catch those but requires an additional OAuth scope and a different payload contract.
Get or list templates
Tool to retrieve or list existing templates. Use when needing template IDs and metadata before making updates or generating documents.
File Updated
Triggers when a file's metadata or content changes in Google Drive.
Update Template
Tool to update a template’s file and settings. Use after confirming the template ID and desired inputs.
Google Drive Changes
Triggers when changes are detected in a Google Drive.
Connect any two apps with Notis in the middle.
Google Drive and Docugenerate, or any other combination from 1,000+ integrations.
When this happens · Trigger
Do this · Action
Save your first hour today.
7-day trial of any paid plan, with 20$ of usage included.
No card. Works with personal or business Docugenerate.