Keep new code scanning alerts in a clear risk register
Notis turns new security alerts into a Gigasheet list you can review without hunting through dashboards.
Trigger
New Code Scanning Alert Created
Triggers when a new code scanning alert is created in a repository. Fires an event for each newly created code scanning alert detected in the configured repository. Alerts can be filtered by Git reference, scanning tool, state, and severity. The payload includes the alert number, rule details, tool information, state, severity, and the location of the most recent instance.
Action
Append Rows to Sheet by Name
Tool to append rows to a sheet by column names. Use after verifying the sheet handle and column names.
Why this helps
Security findings are urgent enough to matter but easy to forget after the initial interruption.
- Centralizes alert follow-up
- Makes security work easier to prioritize
Setup
Build it in a few focused steps.
- 1Connect GitHub and Gigasheet to Notis once.
- 2Create a new portal automation.
- 3Tell Notis to add each new code scanning alert to your Gigasheet risk register.
- 4Choose the New Code Scanning Alert Created trigger and a report channel.
- 5Generate one test alert or use a safe real example.
Questions about this workflow
Will this replace GitHub alerts?
No. It gives you a separate planning view while GitHub remains the source of the alert.
When this happens · Trigger
Do this · Action
Supported Triggers and Actions
Notis builds workflows that link GitHub to Gigasheet. A trigger fires from one place; an action lands in another.
GitHub triggers
Gigasheet actions
New Workflow Artifact Created
Triggers when a new workflow artifact is created in a GitHub repository. Monitors for newly created GitHub Actions workflow artifacts. Optionally filters by artifact name to restrict monitoring to specific artifacts.
Delete sheet or folder by handle
Tool to delete a sheet or folder by handle. Use after obtaining the handle of a sheet or empty folder. Set recursive=True to delete all children of a folder.
Branch Changed
Triggers when a GitHub branch changes. Monitors a specific branch for: - New commits pushed (head commit SHA changes) - Protection status toggled (branch becomes protected or unprotected) - Protection settings changed, including: required status checks and their enforcement level, admin enforcement, required pull request reviews (dismiss stale reviews, code owner reviews, approving review count, last push approval), required linear history, force push allowance, deletion allowance, conversation resolution, branch locking, and fork syncing.
Get Client State Current Version
Tool to fetch the current client-state version metadata for a sheet. Use after obtaining a sheet handle to determine the current version identifier for creating views.
New Branch Created
Triggers when a new branch is created in a GitHub repository. Detects newly created branches. Deleted branches do not fire events.
Get Connector Connections
Tool to list connector connections. Use after setting a valid Gigasheet API token.
Check Run Status / Conclusion Changed
Triggers when a specific GitHub check run changes its status or conclusion. Monitors a single check run for changes to: status (queued, in_progress, completed, etc.), conclusion (success, failure, neutral, cancelled, skipped, timed_out, action_required), started_at, and completed_at.
Get Dataset by Handle
Tool to get dataset metadata. Use after you have obtained the dataset handle.
Check Suite Status / Conclusion Changed
Triggers when a GitHub check suite changes its status or conclusion for a given ref. Monitors all check suites associated with a git reference (branch, tag, or commit SHA) for changes to status (queued, in_progress, completed, etc.) and conclusion (success, failure, neutral, cancelled, skipped, timed_out, action_required, startup_failure, stale). Optionally filters by GitHub App ID.
Get Dataset Columns
Tool to list all column metadata (IDs, names, types) for a dataset. Use after obtaining a dataset handle.
New Code Scanning Alert Created
Triggers when a new code scanning alert is created in a repository. Fires an event for each newly created code scanning alert detected in the configured repository. Alerts can be filtered by Git reference, scanning tool, state, and severity. The payload includes the alert number, rule details, tool information, state, severity, and the location of the most recent instance.
Get Dataset Export Download URL
Tool to retrieve the download URL for an exported dataset. Use after initiating an export and obtaining its handle.
New Repository Collaborator Added
Triggers when a new collaborator is added to a GitHub repository. Monitors the full list of collaborators on a repository and fires an event for each newly added collaborator. The payload includes the collaborator's GitHub username, account ID, profile URL, avatar URL, permission flags (pull, triage, push, maintain, admin), and assigned role name.
Get Dataset Views
Tool to list all views associated with a specific dataset. Use after confirming the dataset handle and its status.
Commit Event
Triggered when a new commit is pushed to a repository.
Get Docs Formulas Functions
Tool to retrieve all supported formula functions. Use after authenticating with a valid API token.
Connect any two apps with Notis in the middle.
Not just GitHub and Gigasheet. Any combination from 1,000+ integrations.
When this happens · Trigger
Do this · Action
Save your first hour today.
7-day trial of any paid plan, with 20$ of usage included.
No card. Works with personal or business Gigasheet.