Keep scope changes from becoming invisible work
When a client request becomes a GitHub issue, Notis can prepare the document that makes the new commitment explicit.
Trigger
New Issue Created
Triggers when a new issue is created in a GitHub repository. Pull requests are automatically excluded -- only true issues produce events. Results can be filtered by labels, assignee, creator, and mentioned user. The payload includes the issue number, title, body, state, labels, assignees, comment count, creator details, timestamps, and direct links to the issue on GitHub.
Action
Create Document
Tool to create a new document for signature. use after finalizing document details and signer list.
Why this helps
Small scope changes accumulate because the agreement step happens outside the project workflow.
- Creates a visible approval step for extra work.
- Keeps issue context attached to the commercial decision.
- Reduces unpaid or ambiguous scope expansion.
- Helps founders pause before committing delivery capacity.
Setup
Build it in a few focused steps.
- 1Connect GitHub and Eversign once in the portal.
- 2Create an automation with: “When a new GitHub issue labeled client-change is created, create an Eversign change-order document from the issue context and report its status.”
- 3Select the New Issue Created trigger and configure the relevant repository or label filter.
- 4Choose a channel for reports and test with one clearly labeled issue.
Questions about this workflow
Can this be limited to client-related issues?
Yes. Use the GitHub trigger’s label and repository filters.
Does Notis create the document from the issue text?
Yes. The instruction can tell Notis to use the issue title, body, and related context.
When this happens · Trigger
Do this · Action
Supported Triggers and Actions
Notis builds workflows that link GitHub to Eversign. A trigger fires from one place; an action lands in another.
GitHub triggers
Eversign actions
New Workflow Artifact Created
Triggers when a new workflow artifact is created in a GitHub repository. Monitors for newly created GitHub Actions workflow artifacts. Optionally filters by artifact name to restrict monitoring to specific artifacts.
Get Document Audit Log
Tool to retrieve the audit log for a document. use after obtaining the document hash to view its full event history.
Branch Changed
Triggers when a GitHub branch changes. Monitors a specific branch for: - New commits pushed (head commit SHA changes) - Protection status toggled (branch becomes protected or unprotected) - Protection settings changed, including: required status checks and their enforcement level, admin enforcement, required pull request reviews (dismiss stale reviews, code owner reviews, approving review count, last push approval), required linear history, force push allowance, deletion allowance, conversation resolution, branch locking, and fork syncing.
Create Document
Tool to create a new document for signature. use after finalizing document details and signer list.
New Branch Created
Triggers when a new branch is created in a GitHub repository. Detects newly created branches. Deleted branches do not fire events.
Create Template
Tool to create a new template. use when you need to programmatically set up reusable document templates after confirming your business settings.
Check Run Status / Conclusion Changed
Triggers when a specific GitHub check run changes its status or conclusion. Monitors a single check run for changes to: status (queued, in_progress, completed, etc.), conclusion (success, failure, neutral, cancelled, skipped, timed_out, action_required), started_at, and completed_at.
Delete Document or Template
Tool to delete a document or template by its hash. use when you need to permanently remove a document or template.
Check Suite Status / Conclusion Changed
Triggers when a GitHub check suite changes its status or conclusion for a given ref. Monitors all check suites associated with a git reference (branch, tag, or commit SHA) for changes to status (queued, in_progress, completed, etc.) and conclusion (success, failure, neutral, cancelled, skipped, timed_out, action_required, startup_failure, stale). Optionally filters by GitHub App ID.
Get Bulk Jobs List
Tool to retrieve a list of bulk jobs for a business. use when you need to view or paginate existing bulk jobs.
New Code Scanning Alert Created
Triggers when a new code scanning alert is created in a repository. Fires an event for each newly created code scanning alert detected in the configured repository. Alerts can be filtered by Git reference, scanning tool, state, and severity. The payload includes the alert number, rule details, tool information, state, severity, and the location of the most recent instance.
List Businesses
Tool to retrieve a list of businesses associated with your account. use when you need to fetch all businesses available to the authenticated user.
New Repository Collaborator Added
Triggers when a new collaborator is added to a GitHub repository. Monitors the full list of collaborators on a repository and fires an event for each newly added collaborator. The payload includes the collaborator's GitHub username, account ID, profile URL, avatar URL, permission flags (pull, triage, push, maintain, admin), and assigned role name.
List Documents
Tool to list documents for a business. use when you need to retrieve documents with optional filters after setting business id in query params.
Commit Event
Triggered when a new commit is pushed to a repository.
List Templates
Tool to list templates for a business with optional pagination. use when you need to retrieve a paginated list of templates.
Connect any two apps with Notis in the middle.
Not just GitHub and Eversign. Any combination from 1,000+ integrations.
When this happens · Trigger
Do this · Action
Save your first hour today.
7-day trial of any paid plan, with 20$ of usage included.
No card. Works with personal or business Eversign.